Jones Engineers performed initial topographic surveying for the purpose of site drainage design. Followed by construction and slope staking of drainage ditch and storm drain location.
Jones Engineers performed full topographic surveying of 25 acres for the purpose of site drainage design. Survey included wetland mapping, and plat mapping.
Survey included boundary survey, topographic survey, and wetland mapping. Project included approximately 9.5 miles of section breakdown traversing, and S acres of wetland locating and mapping.
The Larsen surveys included boundary surveys, topographic surveys, wetland mapping, and creation of records of survey for multiple properties in Whatcom County.
JEI is providing a complete survey package to complement the land planning and civil engineering for this 37 acre residential addition to the existing resort community of Semiahomoo in Blaine, Washington.
Jones Engineers, Inc. completed the boundary survey and monumentation in conjunction with the binding site plan for the 20 acre Silver Creek Industrial Park. This property was bisected by a township line, and posed a cadastral research and boundary resolution challenge.
JEI provided boundary and design data surveys for this 43 acre forested parcel in Bellingham, Washington. The survey project enabled rapid assessment of site conditions by the land planning and civil engineering team.
The E8-E9 Subdivision is the last phase of the Cordata PUD in northern Bellingham. The subdivision is a mixed density residential project consisting of 428 units over 72 acres. Boundary, topographic and environmental surveys have been performed. Construction staking is on-going. As-build and supplementary design data surveys are also ongoing as each phase of the project is completed.
Phone: (360) 733.88884164 Meridian Street, Suite 304Bellingham, Washington 98226
Phone: (360) 733.88884164 Meridian Street, Suite 304Bellingham, Washington 98226